- 3,900 square foot stand-alone helipad building.
- JLN was responsible for the steel design of this project and worked closely with the design team to properly coordinate the mechanical and electrical design requirements.
- Building featured:
- A 1 ton crane for helicopter maintenance.
- Insulated horizontal panels matching the existing architect.
- 40’ wide by 20’ tall hangar door allowing the helicopter to be stored securely in the building.